久章草在线视频播放

<dfn id="c5p64"><option id="c5p64"><mark id="c5p64"></mark></option></dfn>
  • <th id="c5p64"></th>
    <code id="c5p64"></code>

    <code id="c5p64"></code>

      <tr id="c5p64"></tr>

        project

        PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
        Home >  project >  Concrete Machinery >  DOHA METRO-GREEN LINE
        project

        DOHA METRO-GREEN LINE

        Adding time: 2019.08.30

        Share
        Concrete Placing Boom in Malaysia

        Project Description:

        Total construction mileage 300km include 100 stations, which has both underground lines and elevated lines

        The project’s D&B contract of the Green line underground project has been given to a JV led by PORR Bau, Saudi Bin Laden Group and Hamad Bin Khalid Contracting.


        Truemax Solutions:

        Total concrete equipments solution and accessory. Included the mixer, mold, gantry crane, pumping, placing, galvanize steel walk way etc.    


        Job Site: Qatar


        久章草在线视频播放

        <dfn id="c5p64"><option id="c5p64"><mark id="c5p64"></mark></option></dfn>
      1. <th id="c5p64"></th>
        <code id="c5p64"></code>

        <code id="c5p64"></code>

          <tr id="c5p64"></tr>