久章草在线视频播放

<dfn id="c5p64"><option id="c5p64"><mark id="c5p64"></mark></option></dfn>
  • <th id="c5p64"></th>
    <code id="c5p64"></code>

    <code id="c5p64"></code>

      <tr id="c5p64"></tr>

        project

        PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
        Home >  project >  Concrete Machinery >  DUBAI PEARL
        project

        DUBAI PEARL

        Adding time: 2019.08.30

        Share
        Concrete Placing Boom in Malaysia

        Project Description:


        Status: Under Construction


        Construction Started: 2009


        Estimated Completion: 2021


        Floor Count &Height: 73-Storey / 300m


        Floor Area: 1,850,000 m2


        Developer: Al Habtoor Engineering Enterprises and Leighton Contractors


        Truemax Solutions:


        Rank 1st in the United Arab Emirates

        TRUEMAX’s first tower crane order in Middle East (50nos), more than 15,000,000USD;


        Job Site: U.A.E


        久章草在线视频播放

        <dfn id="c5p64"><option id="c5p64"><mark id="c5p64"></mark></option></dfn>
      1. <th id="c5p64"></th>
        <code id="c5p64"></code>

        <code id="c5p64"></code>

          <tr id="c5p64"></tr>